• About Us
  • Advertise
  • Contact Us
  • Privacy Policy
Saturday, August 22, 2026
No Result
View All Result
NewsNet Nigeria
  • Home
  • News
    • Local News
    • National
  • Politics
  • Economy
    • Oil and Gas
  • Crime
  • Education
  • Health
  • Entertainment
    • Lifestyle
  • Sports
  • MORE
    • Interview
    • Editorial
    • Opinion
    • Columns
    • Science & Tech
    • Videos
NewsNet Nigeria
No Result
View All Result
Home News Local News

No More Delays: Oborevwori Takes Inspection to Ugbolu–Okpanam, Oko Road Projects

by NewsNet Nigeria
6 months ago
in Local News, News, Transportation
No More Delays: Oborevwori Takes Inspection to Ugbolu–Okpanam, Oko Road Projects
Share on FacebookShare on TwitterShare on LinkedinShare on Whatsapp

Governor of Delta State, Rt. Hon. Sheriff Oborevwori, has reaffirmed his administration’s commitment to quality infrastructure and timely project delivery during inspection visits to the ongoing Ugbolu–Okpanam and Phase 2 of Oko-Anala – Oko-Ogbele – Oko-Odifili Road projects.

Speaking during the inspection of the 12.12-kilometre Ugbolu–Okpanam Road on Tuesday, the Governor said his visit was aimed at personally assessing the progress of work rather than relying solely on reports from engineers.

“I did not just come here casually, I came to personally inspect and see for myself the level of work,” he said, emphasizing that follow-up is as important as groundbreaking and commissioning ceremonies.

Governor Oborevwori recalled that he began giving serious consideration to the project around July last year due to the persistent movement challenges experienced by residents along the corridor. The groundbreaking ceremony was performed in October.

The Governor disclosed that although the original timeline for the project is 18 months, the contractor has assured the state government of completion by December this year.

ALSO READ  Oyede's First Ovie Hails Oborevwori for Royal Confirmation

The road, he explained, is designed with 7.7-metre-wide concrete drains on both sides, with an overall width of approximately 11 metres and an 8-metre main carriageway.

According to him, the extensive drainage system is critical given the flooding challenges in the area, adding that Okpanam sits on higher ground, causing water to flow into surrounding lower areas, which has over the years led to severe flooding.

The ongoing construction of comprehensive drainage channels, he said, would redirect water safely to the river and significantly address flooding concerns.

He said: “Some of the previous drain systems were either single or double but not adequate to handle the volume of water. We are ensuring that this drainage infrastructure is comprehensive and durable. Residents will notice the difference during the rainy season”.

ALSO READ  'Pray for Me, Pray for Delta' — Oborevwori's Heartfelt Appeal as He Turns 63

Describing the road as strategically important, Oborevwori said it connects Ugbolu and Okpanam communities, enhances social and economic activities, and promotes unity between urban and semi-urban areas.

He stressed that his administration is deliberate about inclusive development, noting that infrastructure projects are being spread across various local government areas to ensure balanced growth.

“We are not only constructing flyovers and roads in urban centres; we are also extending infrastructure to rural communities. Development must be balanced,” he said.

At the Phase 2 of Oko-Anala – Oko-Ogbele – Oko-Odifili Road project site, Governor Oborevwori reiterated his insistence on meaningful progress and strict adherence to timelines.

He explained that the project was structured in phases, with Phase One covering approximately 4.7 kilometres now completed. Phase Two, which spans about five kilometres, remains outstanding.

The Governor described the terrain as extremely challenging, revealing that large quantities of unsuitable clay soil had to be excavated and removed to ensure a stable foundation.

ALSO READ  Gloria Patrick-Ferife Heads to Health Ministry as Oborevwori Reshuffles Permanent Secretaries

He said: “If you do not properly remove unsuitable soil and stabilise the base before filling, the road will not last,” disclosing that the contractor had initially projected completion of Phase Two by August 2027, a timeline he firmly rejected.

Oborevwori assured residents of Oko-Anala – Oko-Ogbele – Oko-Odifili Road projects, that the state government has fully mobilised the contractor and made funds available, stressing that there are no financial constraints from the government’s side.

He urged the contractor to intensify effort and complete the project before the end of this year or early next year, saying; “if contractors want more jobs from this administration, they must deliver quality work and complete projects on time”.

Reaffirming his administration’s guiding principle, Oborevwori declared: “We believe in standards, and we will not compromise on quality.”

Previous Post

High Airfares Still Cheaper Than Kidnappers’ Ransoms, Uvwie Monarch Warns at Book Launch

Next Post

Fresh Appointments: Oborevwori Picks Kakor Ese, Okoh Sabastine for Key Delta Agencies

MORE NEWS

Izediunor Petition: Ogwashi-Uku Palace Says No Case Left to Litigate After Double Supreme Court Defeat
Judiciary

Izediunor Petition: Ogwashi-Uku Palace Says No Case Left to Litigate After Double Supreme Court Defeat

August 20, 2026
Okpare Olomu Dismisses Crisis Rumour, Reaffirms Moses Orokpo as Otota
Local News

Okpare Olomu Dismisses Crisis Rumour, Reaffirms Moses Orokpo as Otota

August 20, 2026
Ughelli North Council Sets Otor-Iwhreko on New Course, Inaugurates Caretaker Committee
Local News

Ughelli North Council Sets Otor-Iwhreko on New Course, Inaugurates Caretaker Committee

August 18, 2026
Muslims or Christians? Enenche Wants Census to End Nigeria’s Numbers Game
National News

Muslims or Christians? Enenche Wants Census to End Nigeria’s Numbers Game

August 17, 2026
Next Post
Oborevwori moves to implement new minimum wage

Fresh Appointments: Oborevwori Picks Kakor Ese, Okoh Sabastine for Key Delta Agencies

Leave Comment

RECENT STORIES

Auto Draft

Oborevwori Woos Farmers, Investors With Roads, Power as Delta Pushes Beyond Oil

August 22, 2026
Asu Ekiye: Wife Walked Out, Filed for Divorce

Asu Ekiye: Wife Walked Out, Filed for Divorce

August 22, 2026
Bitcoin, Gold Climb as US Bond Move Rekindles Dollar Weakness Fears

Bitcoin, Gold Climb as US Bond Move Rekindles Dollar Weakness Fears

August 22, 2026
Davido vs Okpebholo: Edo Disowns ‘Ban’ After Governor’s Aide Warns Singer

Davido vs Okpebholo: Edo Disowns ‘Ban’ After Governor’s Aide Warns Singer

August 22, 2026
Tinubu Fires 2027 Warning, Vows to Fight Until the Very End

ICPC Finds Another ‘Fake Agency’ in OSGF, Tinubu Orders Arrest

August 22, 2026

TRENDING STORIES

  • Izediunor Petition: Ogwashi-Uku Palace Says No Case Left to Litigate After Double Supreme Court Defeat

    Izediunor Petition: Ogwashi-Uku Palace Says No Case Left to Litigate After Double Supreme Court Defeat

    0 shares
    Share 0 Tweet 0
  • Okpare Olomu Dismisses Crisis Rumour, Reaffirms Moses Orokpo as Otota

    0 shares
    Share 0 Tweet 0
  • Ughelli North Council Sets Otor-Iwhreko on New Course, Inaugurates Caretaker Committee

    0 shares
    Share 0 Tweet 0
  • 12 Duplexes, 12 Vehicles: Oborevwori Gives Delta Permanent Secretaries Welfare Boost

    0 shares
    Share 0 Tweet 0
  • “Good Morning, Tony”: Elumelu’s Correction Sparks Debate Over Nigerian Respect Culture

    0 shares
    Share 0 Tweet 0
  • About Us
  • Advertise
  • Contact Us
  • Privacy Policy

NEWSNET NIGERIA Published By: Morex Consult Limited - Since 2020.

No Result
View All Result
  • Home
  • News
    • Local News
    • National
  • Politics
  • Economy
    • Oil and Gas
  • Crime
  • Education
  • Health
  • Entertainment
    • Lifestyle
  • Sports
  • MORE
    • Interview
    • Editorial
    • Opinion
    • Columns
    • Science & Tech
    • Videos

NEWSNET NIGERIA Published By: Morex Consult Limited - Since 2020.